• img
  • img

Portion of McCants Drive to be closed during Mount Pleasant Waterworks’ Project

March 24, 2017

McCants Drive Closure

Portion of McCants Drive to be closed during Mount Pleasant Waterworks’ Project

Beginning on Monday, March 27, 2017 at 6:00 a.m. a portion of McCants Drive will be closed. This closure will include McCants Drive from the entrance at Ben Sawyer Boulevard to Glencoe Street (just before the fire station on McCants). Drivers traveling down Ben Sawyer will detour to Center Street to enter the Old Village. Drivers traveling down McCants toward Ben Sawyer to access Rifle Range Road should detour down Glencoe Street to Center Street and circle back.

This portion of McCants Drive will be closed until Thursday, March 30, 2017. Please respect the residents living along the detour route by traveling at a reduced speed with extra caution.

Mount Pleasant Waterworks is working to replace water and wastewater lines in this area. During this project, the excavation will not be backfilled to speed up the work. We ask that residents avoid the area if possible. If traveling in the area, please use caution and help us keep the public safe.

PAY YOUR

BILL ONLINE

ONLINE ACCOUNT LOGIN MAKE ONE TIME PAYMENT PROJECTS UNDER CONSTRUCTION What's Happening This Week

QUICK LINKS

  • img
  • img
 
© 2017 Mount pleasant waterworks. all rights reserved.

Web Design by InterCoastal Net Designs